As the London’s iconic Shard skyscraper, which is the UK’s tallest building at 309.6m, gets ready to mark the 10th anniversary of its opening on 1 February, this episode catches up with Flan McNamara who led the construction project for Sellar Property Group.
As well as exploring the logistical challenges of bringing the architectural design of Renzo Piano and the engineering work of WSP to life, Flan and NCE editor Claire Smith talk about lessons learned during the life of the project.
Flan talks about how digital technology evolved during the lifespan of the Shard Quarter project, which transformed both the skyline around London Bridge station and was integral to the modernisation of the station itself. He talks about BIM being in its infancy when the Shard itself was conceived and the potential benefits such technology could bring to the project if it was starting today.
Flan also discusses the pace of change that saw a huge leap forward in the technology used to deliver the buildings surrounding the Shard that came later in the programme. However, he believes that the industry needs to go further and faster with adopting digital twin technology to really drive construction efficiency and productivity.
Flan and Claire conclude the conversation by considering what the tall buildings sector might look like in another 10 years when the Shard marks its 20th anniversary. Flan believes that it is only airport flight paths holding London back from another building taking the Shard’s record but whatever the height of future tall buildings, he thinks that mixed use developments are the key to success both for the climate and commercially.
The Engineers Collective is powered by Bentley Systems. Around the world, engineers and architects, constructors and owner-operators are using Bentley’s software solutions to accelerate project delivery and improve asset performance for transportation infrastructure that sustains our economy and our environment. Together, we are advancing infrastructure.
Find out more at www.bentley.com
Francis Scott Key collapse and Everton's new stadium - Plus ICE President Anusha Shah on biodiversity and nature based solutions
Implications of the budget, new reservoirs on the way and mining in Yorkshire, plus PAS 2080 and systems thinking with Mott MacDonald
In the news: climate, rail reform, and space weather? Plus, building theworkforce of the future at the Constructionarium with Julia Stevens
How hydrogen could ‘electroshock’ the energy transition, with Arthur D Little
What does ‘transforming infrastructure performance’ mean?
The value of place making in construction and engineering
The importance of collaborative reporting to ensure structural and fire safety
How cloud based data management is improving delivery of major infrastructure projects
How smart data could improve flood management to create climate resilient infrastructure
Making a visible difference to tackling mental health and suicide risk in construction
Technology has changed the face of construction over the last 40 years but further change is needed
Success of megaprojects is down to a handful of key factors
Artificial Intelligence will supercharge engineers rather than replace them
How dialogue and collaboration delivered the Bank Station Capacity Upgrade on budget
How technology uptake is the key to delivering work faster with fewer people
2022 recap featuring HS2 costs, Norway bridge collapse and imperial measurements backlash
Why civil engineers and financiers need to build better relationships to deliver on net zero
Barriers to adopting digital technology in construction
Designing to create space rather than a building is key to regeneration
Create your
podcast in
minutes
It is Free
WSJ Tech News Briefing
Rebel Tech
CyberWire Daily
The WAN Show
Cyber Security Headlines