š¢ POLY PROCESSING ā Distributor Newsletter and Podcast | September 2025
š Quick Hits
10,500 Gallon SAFE-Tank Mold Completed
ā
The new 10,500 SAFE-Tank moldĀ is officially complete, and test parts are running now!
Our new 10,500 Safe TankĀ can hold two full truckloads of chemicalĀ and still have room to spare. Perfect for getting into specs ā get it into your future bids now. Initial Drawings are already on the P3 homepageĀ (share it with customers) but it will be on our main website soon- after production test parts are measured for final accuracy.
ā” ACTION:Ā If you have a customer interested in a 10,500 SAFE-Tank, notify your Regional Manager or Frontline contactĀ to get it queued for production. We need to know what initial orders might be coming!
ā Help Us Help You ā Google Reviews
Boost visibility and leads for all of us!
Please take a moment to leave a 5-star reviewĀ for the PPC Plant you work with most. ā Click on Winchester, Monroe, or California to go to the Google review for that facility.
These reviews improve our SEOĀ and Google Ads performance, driving more leads to you.
š P3 Resources You Might Have Missed
Trade show support materials, including small 3D printed sample tanksĀ (3 sets available).
š§ Email marketing@polyprocessing.comĀ at least 2 weeks ahead to reserve.
š¦ Order Status Made Simple
Check your orders anytime at PolyOrderCheck.com
š§ Inside Sales Tips
š” Leak Detection Kits ā Now in One Box
All components now ship together in a single box:
(Sensor, 25 ft. wire, Pro Alert box, siren & light, bushing, and cord grip).
š¦ Labeled āLeak Detection for Tanksā for easy identification by installer or contractor.
Same part number as before ā just streamlined.
Upcoming Event ā WEFTEC 2025
š Chicago McCormick Place ā Booth #2218
š
September 29 ā October 1
Look for our rotating signĀ and stop by to see: