EMS provider Matric Group's Patrick Stimpert incorporated the Toyota Production System’s Lean principles into his contract manufacturing business.
“Results are important. How do I get my results?," he states. "With the use of the Toyota Production System’s Lean principles and my simple rule 'Don’t waste time rearranging deck chairs on the Titanic, go fix the problem.' I believe in the "LEAN-IN" processes and gain improvements through RIPs (Rapid Improvement Projects) These projects are based on a standard of identifying problems, brainstorming solutions, attempting those solutions, and adjusting from there. If we are going to fail, we are going to fail fast and cheap.”
PCB Chat 87: Jorge Cardona on EMS in Colombia
RM 82: Paul Salerno on Soldering Materials and Selection
PCB Chat 86: Wally Rhines on the ECAD Market Data
RM 80: Cheryl Tulkoff and Greg Caswell on DfX
RM 79: Arch Systems‘ Dave Trail about Industry 4.0
PCB Chat 85: Matt Dyson on Electrically Conductive Adhesives
C2C 11: Poligage Founder and CEO Christine Davies
RM 77: James Kovacevic on Maintenance Reliability Training
RM 76 - Meet the Press
C2C 10: Zestron‘s Dr. Harald Wack
PCB Chat 84: Gowtham Ramachandran on the ‘Desktop Microfactory‘
C2C 9: Foresite Founder Terry Munson
RM 74: Worthington Assembly's Chris Denney on Contract Manufacturing
RM 73: Solder Paste Expert Tim Jensen of Indium
PCB Chat 83: Vincent Bedat of Volthub on OEM-EMS Data Sharing
C2C 8: STI Electronics' David Raby
RM 72: Thermal Profiling with ECD's Mark Waterman
PCB Chat 82: The RIT CEMA Capstone Project Team
PCB Chat 81: Terry Jernberg of EMA on Power Integrity
Create your
podcast in
minutes
It is Free
Insight Story: Tech Trends Unpacked
Zero-Shot
Fast Forward by Tomorrow Unlocked: Tech past, tech future
The Unbelivable Truth - Series 1 - 26 including specials and pilot
Acquired